A specified speed of 600 m/min gives this equipment considerable production capacity for optical-fiber applications. Before making purchasing plans, buyers should verify the actual speed, configuration, and operating conditions with the manufacturer.

Shanghai Weiye OFC provides a system engineered to manufacture 12- and 16-fiber rollable ribbons. Its product description presents the equipment’s capabilities, technical specifications, and included systems, providing U.S. buyers with a basis for comparing their equipment requirements.

Begin by examining the stated equipment configuration, then ask the supplier for pricing, installation requirements, and project-specific alternatives. This approach helps determine which equipment details apply to your particular manufacturing site and goals.

The listed address for Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. is 201 Minyi Road, Songjiang District, Shanghai. Use the product page for initial reference and verify current technical and commercial information directly with the company. Submitting a clear request for pricing and specifications can help you move forward with the assessment.




Important Points To Consider

  • The stated operating speed is 600 m/min, although the manufacturer should confirm the applicable conditions.
  • The machinery is intended to manufacture rollable ribbons containing 12 or 16 fibers.
  • Information about equipment functions, specifications, and included systems appears on the product page.
  • Ask the supplier to clarify costs, installation arrangements, and requirements unique to your project.
  • The supplier provides a business address in Songjiang District, Shanghai.

Overview Of The Intermittent Bonded Ribbon Production Line

The manufacturer identifies this machinery as suitable for 12- and 16-fiber rollable IBR formats. Its product page specifies a construction speed of 600 m/min and a fiber diameter of Ф245 μm ±10 μm. Because these figures represent stated machine specifications, buyers should verify achievable speeds and operating conditions with the manufacturer.

Intermittent Bonded Ribbon Production LineIntermittent Bonded Ribbon Production Line

Designed To Produce Twelve- And Sixteen-Fiber Rollable Ribbons

The machine configuration accommodates two different fiber counts in rollable ribbon designs. Buyers can use these options as a starting point for checking compatibility with target formats, fiber sizes, and handling requirements.

How Intermittent Bonding Supports Flexible Fiber Arrangement

The patent’s design examples describe neighboring fiber subunits joined by adhesive bonds positioned at intervals. The patent provides an example of adhesive-bond intervals ranging between 10 mm and 1,000 mm. This differs from a continuously bonded structure in which the connection extends across the full ribbon length.

By spacing the bonds apart, the assembly can move between a mostly planar arrangement and a rolled, curled, or folded shape. The specified spacing illustrates the patented design concept rather than confirmed production-machine settings.

  • Machine details: A choice of 12 or 16 fibers, a listed operating speed of 600 m/min, and a specified diameter of Ф245 μm ±10 μm.
  • Patent example: Adhesive-bond intervals ranging from 10 mm to 1,000 mm.
  • Design benefit: Flexible handling across several possible shapes.

Uses In Optical Fiber Cable Manufacturing

Adjustable fiber layouts may allow cable designers to combine convenient splice access with space-efficient packaging. The patented design keeps fibers arranged in order while permitting sections between bonded points to shift as the cable is assembled.

Compact Cable Designs And High Fiber Density

For mass fusion splicing, an optical fiber ribbon can be arranged flat before being folded or rolled into a more compact cable. Potential advantages described in the patent include smaller cable constructions and an increased ratio of fiber area to overall cable cross-sectional area. The results achieved in practice depend on the complete cable construction and its intended use.

Organizing Fiber Ribbons To Support Efficient Fusion Splicing

This design supports orderly fiber handling during splicing while providing flexibility for subunit movement in the assembly process. The manufacturer’s material-handling specifications identify payoff reel capacities of 25.2 km and 50.4 km of fiber. These reel capacities can be compared with the facility’s cable-manufacturing needs and material-handling setup.

Design detail Potential use Consideration for buyers
Flat fiber configuration Fusion splicing of multiple fibers Verify the needs of your splicing process
Ribbon configuration that folds or rolls Space-efficient cable packaging Review the overall cable construction
Payoff reels with capacities of 25.2 km and 50.4 km Material-handling preparation Match the reel capacity to production operations

Production Line Specifications And Performance

Before asking for pricing, assess whether the stated machine performance matches the demands of your production process. Reel compatibility and facility utility requirements are also important considerations for installation planning.

Production Speed, Fiber Diameter, And Attenuation

The stated construction speed is 600 m/min. The specified fiber diameter is Ф245 μm ±10 μm, while additional attenuation is stated as ≤0.01 dB/km at 1550 nm. Ask the supplier to verify the testing conditions and achievable results.

Compatibility With Payoff And Take-Up Reels

Two payoff reel sizes are offered, with each full reel limited to 10 kg. The take-up assembly supports a T-type reel as well as a fiber-optic reel. Verify that your selected reel configuration is compatible with the facility’s material-handling process.

Facility Utilities And Operating Environment

The machine requires a three-phase, five-wire electrical supply rated at 380 V ±10%. Its specified operating environment is enclosed, clean, dry, and protected from drafts, with temperatures of 15 to 25°C and relative humidity no higher than 85%. Utility requirements also include nitrogen at 7 bar and 99.99% purity, plus a compressed-air supply at 6 bar. Verify the required utility connections before installation begins.

Technical specification Published requirement Installation planning note
Reels for fiber payoff Ф236 × Ф25.4 × 108 mm; Ф267 × Ф25.4 × 180 mm; maximum full-reel weight ≤10 kg Check reel compatibility and maximum weight
Reel used for take-up T-type dimensions of Φ410 × Φ50.8 × 391 mm, or a fiber-optic reel Verify the preferred reel format
Electrical and environmental requirements Power supply of 380 V ±10%; temperature of 15 to 25°C; humidity ≤85% Provide a clean, dry area without drafts
Gas utility supply Nitrogen: 7 bar, 99.99% purity; air: 6 bar Verify gas supply capacity before installation

Equipment For Fiber Payoff And Gathering

The payoff and gathering assemblies direct optical fibers into the ribbon-forming area. The associated controls help maintain a steady supply of fiber while reducing handling risks.

Tension-Controlled Payoff System For Sixteen Spools

The payoff assembly holds 16 spools and provides traversing along with separately adjustable tension settings. Each spool has a maximum weight capacity of 10 kg. Detailed specifications indicate a tension range of 0.4 to 2 N, accuracy of ±0.02 N, and a 550 W motor. Another overview gives a range of 40 to 150 g and accuracy of ±2 g, so buyers should confirm which specification applies to their configuration.

Fiber Guiding, Break Detection, And Electrostatic Control

U-groove guides, multi-groove gathering rollers, and anti-jump components channel fibers into the forming section. Operators receive alerts about fiber problems through break detection and alarm functions. Protective guards and pneumatic clamping provide additional support for safe material handling. A rod-type electrostatic dust collector is positioned at the fiber exit, and additional anti-static devices help control dust throughout the gathering path.

Equipment component Listed detail Purpose
Payoff Capacity for 16 spools, each weighing up to 10 kg Supplies fibers using traversing
Motor and tension system 0.4 to 2 N with ±0.02 N accuracy; 550 W Supports regulated payoff of fibers
Guidance and safety Grooved rollers, alarms, guards, and pneumatic clamping Guides fiber movement and assists material handling
Static control Rod-style electrostatic collector with anti-static devices Helps reduce dust near fiber routes

Precision Molding And Intermittent Adhesive Dispensing

The ribbon-forming platform allows operators to control the mold position and placement of adhesive. Available adjustments help configure the process for each required ribbon format.

Adjustable IBR Mold Platform For Ribbon Formation

Three mold sets are provided for ribbon formation, and each accommodates as many as five Nordson EFD jet valves. The mold adjustment range extends from 0 to 15 mm, while the mold base can be maintained between 20°C and 60°C. Precision valve groups mounted on sliding tables allow fine positioning and accurate application of adhesive dots.

Adjustable Nozzle Configurations For Twelve- And Sixteen-Fiber Ribbon Production

The 12-fiber configuration employs a 5+5+1 valve arrangement. The 16-fiber format is produced using a 5+5+5 valve layout. The control interface enables changes to dot count and spacing according to the ribbon configuration being manufactured. A dedicated adhesive is required for the coating and curing stages.

Setting 12-Fiber Format 16-Fiber Format
Dispensing valve layout 5+5+1 valve configuration Valve arrangement of 5+5+5
Mold positioning range Adjustment range of 0 to 15 mm Adjustment range of 0 to 15 mm
Temperature of the mold base Temperature range of 20°C to 60°C 20°C to 60°C operating range

UV-LED Curing For Bonded Fiber Ribbons

The curing assembly applies UV exposure in stages to harden adhesive throughout the fiber structure. Prospective buyers can assess the oven configuration and listed operating specifications to determine whether the equipment suits their production process.

Initial Pre-Curing And Main Curing Operations

Three dedicated LED-UV ovens rated at 800 W each perform the pre-curing operation. Each oven processes fibers supplied by a separate mold group before the material reaches the main 6 kW post-curing oven. The system uses adjustable shutters to help contain UV exposure and minimize nitrogen losses. The supplier states a principal wavelength of 395 nm ±3 nm, minimum curing degree of 85%, and post-curing power of no less than 2.5 kW.

Managing Nitrogen Supply And Curing Performance

The nitrogen flow rate and pressure can be adjusted by hand. Automatic functions also start nitrogen delivery during startup and stop it at shutdown. At production speed under continuous stable conditions, the specified lamp-array power consumption is no more than 80% of total power. The figures are useful for initial equipment assessment, but buyers should confirm the conditions under which they were measured. Discuss how the operating settings may change depending on the adhesive and materials selected.

Visual Inspection, Capstan Traction, And Take-Up

Visual inspection and consistent winding help preserve fiber quality as material passes through the production line. The published operating settings also offer buyers useful criteria for comparing equipment against their cable production requirements.

Real-Time Inspection Of Fiber Colors And Adhesive Dot Placement

A microscope and camera provide enlarged images in real time. Operators can inspect optical-fiber color order and verify the presence of resin dots at individual dispensing locations. This inspection helps identify ribbon problems before the material enters the winding stage.

Servo-Driven Traction And Precision Take-Up

The Φ190 mm capstan traction wheel is driven by a 1 kW AC servo motor. The listed measurement accuracy exceeds 1‰. Operators can set tension between 50 and 500 g while maintaining an accuracy of ±5 g. Together, these settings support controlled movement and handling of the fiber ribbon.

The specified take-up speed is 600 m/min, and the maximum spool weight is 30 kg. The servo-driven take-up and traversing assemblies support uniform positioning during winding. The cable pitch setting allows continuous adjustment from 1 to 6 mm. Position detection and direction changes are supported by a photoelectric sensor. Check the intended cable requirements and actual operating conditions with the manufacturer.

Electrical Controls And Production Monitoring

Accessible controls allow operators to adjust settings, check equipment status, and arrange orderly shutdowns. According to the manufacturer, the machinery incorporates Siemens controls alongside Schneider Electric switchgear.

Operating The Production Line Through PLC And Touchscreen Controls

Siemens S7-1200 and S7-1500 PLCs manage the ribbon manufacturing system through a 10.4-inch Siemens touchscreen. Low-voltage switchgear is supplied by Schneider Electric. Operators may control the entire line with interlocked units or run individual sections independently.

Settings, Alarms, And Length-Based Stops

Through the touchscreen, operators can manage process settings, activate curing ovens, configure wire feeding, and view alarms. It also displays lamp operating hours, live lamp current, oven temperature, and the equipment’s accumulated operating time. A meter-counter correction function helps synchronize displayed length measurements with actual material movement.

A preset length can be entered to initiate slowing or stopping of the machine. The function supports managed stopping as a cable manufacturing run reaches its planned length. Ask the manufacturer to confirm control capabilities and setup requirements before placing an order.

Control feature Listed detail Practical function
PLC controls and operator display Siemens S7-1200/S7-1500; 10.4-inch touchscreen Configure settings and examine production data
Electrical control components Schneider Electric low-voltage switchgear Provides support for system control
Monitoring and stopping Lamp, oven, runtime, and meter information with preset length Monitor production and stop or decelerate the equipment

Materials, Process Compatibility, And Ribbon Quality

Adhesive selection affects both the consistency of coating application and the final product. Rather than recommending a general adhesive, the supplier specifies a formulation dedicated to the equipment’s coating and curing operations.

Specialized Adhesive Used For Bonding And Curing

The pressure-fed adhesive system provides independent valve switches so each supply path can be opened or closed as required. Precision pressure-regulating valves help maintain controlled adhesive delivery at each dispensing location. The specified air pressure is adjustable, with a required minimum of 0.5 MPa.

The adhesive lines are black to reduce the risk of UV-triggered reactions while the system operates and cures material. This protection is important because premature exposure may change adhesive properties before application to the fiber.

Confirm suitable adhesives, process parameters, and surface-finish requirements with the manufacturer before choosing materials for a secondary coating operation. Ask how the recommended adhesive performs under your intended application conditions and expected production length. Detailed manufacturing guidance can support consistent quality throughout setup and the completed run.

Installation Requirements And Included Documentation

Ensure the workspace and utility supplies are ready before scheduling the machine’s installation. The manufacturer’s stated requirements help buyers prepare their facilities and maintain stable operation of the optical fiber equipment.

Required Facility Conditions And Connections Provided By The Buyer

Install the machinery in a clean, dry, enclosed environment protected from drafts. Maintain a room temperature of 15 to 25°C and relative humidity no higher than 85%. The installation also requires nitrogen supplied at 7 bar with 99.99% purity and an air supply rated at 6 bar.

Connection cables and cable trays are excluded from the supplied equipment. The buyer must arrange the principal power feed-in cable. Before installation, check cable routing and utility capacity, particularly when the machine will be located near secondary coating operations.

Documentation For Operation, Installation, And Maintenance

Documents covering installation, equipment use, and maintenance are provided by the manufacturer. Inspect the supplied documentation before commissioning so personnel can organize tasks and obtain required materials.

  • Instruction manuals, operating guides, and a general layout drawing
  • Electrical schematics, wiring diagrams, and drawings for installation and maintenance
  • Manuals for purchased parts and a list of wear parts for maintenance planning

These documents help maintenance and production teams prepare for initial startup and regular equipment care.

Choosing A Ribbon Production Line For Your Manufacturing Needs

First determine which finished ribbon products your business plans to offer. The machinery supports 12F and 16F formats and has a stated construction speed of 600 m/min. Compare those specifications with your expected product mix, production targets, and anticipated cable demand.

Before purchasing the machine, confirm that its take-up arrangement matches your requirements. A standard IBR reel measures Φ410 × Φ50.8 × 390 × Φ310 mm, accommodates a maximum weight of 30 kg, and allows cable pitch settings between 1 and 6 mm. Confirm that the listed reel dimensions, capacity, and pitch range are appropriate for your site and handling process.

Payoff reel compatibility also deserves attention. Available options include international-standard spools accommodating 25.2 km, 50.4 km, and 63 km. Obtain the exact spool dimensions before ordering materials or planning the length of manufacturing runs.

In addition to speed, consider power and gas utilities, suitable adhesives, and the available monitoring functions. For cable manufacturing, determine whether the configuration suits fiber cable, loose tube, or another planned application. Discuss machine configuration and commissioning arrangements with Shanghai Weiye before committing to the purchase. A thorough compatibility assessment can help prevent expensive modifications later.

Production planning consideration Listed detail Required buyer verification
Ribbon configurations and operating speed 12F, 16F; specified speed of 600 m/min Compare with target production and product mix
Take-up 30 kg maximum capacity; adjustable pitch from 1 to 6 mm Check reel compatibility and facility requirements
Payoff spools 25.2 km, 50.4 km, and 63 km spool capacities Verify exact spool dimensions

Request A Quote For The Intermittent Bonded Ribbon Production Line

U.S. buyers can evaluate a system offering 12F and 16F formats, a specified construction rate of 600 m/min, and specialized optical fiber ribbon-forming equipment. Compare these features with your planned cable products to assess equipment suitability.

A pricing inquiry should include your chosen format, projected production quantity, reel requirements, and facility utility details. Include information about the fibers and material-handling process to allow Shanghai Weiye to review the intended setup.

Before ordering, verify adhesive compatibility, the specified LED wavelength of 395 nm ±3 nm, and the published curing performance. Discuss how the stated specifications affect your intended material and finished surface-quality objectives.

Consult the product page for the published equipment description. Contact Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. to confirm machine configuration, delivery arrangements, and commissioning requirements. The company’s listed address is 201 Minyi Road, Songjiang District, Shanghai. You can call 021-60701630 to review your project needs with the supplier. A detailed quotation inquiry helps define the next steps in purchasing.

HOW OPTICAL FIBERS ARE ARRANGED DURING RIBBON MANUFACTURING

Intermittent bonded ribbon production line explained

Equipment for producing rollable formats in optical-fiber manufacturing is supplied by Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. This setup is designed for 12- and 16-fiber ribbons, allowing buyers to compare its capacity against their planned product range. Its split-type construction may also influence factory space and installation requirements.




The stated construction speed for this particular production line is 600 m/min. Fiber pay-off, gathering and guiding, intermittent resin dispensing, UV-LED curing, visual monitoring, capstan pulling, and take-up are combined in the process. The complete process is important to evaluate, not just the stated speed.

Factory utilities, reel requirements, available floor space, and installation conditions should be reviewed before purchase. Ask the supplier for its documentation package and check the system’s suitability for your cable design and operating requirements. Early planning for these details can minimize setup delays and make startup smoother.

Main Takeaways

  • Designed for rollable 12- and 16-fiber formats.
  • Specified equipment speed: 600 m/min.
  • Uses a split-type construction.
  • Curing, monitoring, pulling, and take-up stages are included.
  • Check utilities, reels, installation needs, and supplier documents before buying.

Intermittent Bonded Ribbon Production LineIntermittent Bonded Ribbon Production Line

Explore The Intermittent Bonded Ribbon Production Line

Three mold groups help form rollable IBR formats by positioning fibers for small adhesive dots. Mold position is adjustable by operators from 0 to 15 mm, helping maintain consistent spacing and form.

Produce Rollable Fiber Ribbons With Precision Bonding

A 16-spool pay-off supplies fiber to the machine, while guide rollers with U-shaped grooves keep individual strands organized. Steady contact during processing is encouraged by the rollers’ hard-anodized surfaces. The adjustable valve arrangement supports 12F and 16F layouts, using 5+5+1 valves for 12 fibers or 5+5+5 for 16. Ask the supplier to verify tension control settings that suit your particular cable design.

Support 12- And 16-Fiber Configurations At Speeds Up To 600 m/min

Construction speed is specified at up to 600 m/min. Pay-off reel options hold 25.2 km or 50.4 km of fiber according to the listed reel dimensions: Φ236 mm × Φ25.4 mm × 108 mm and Φ267 mm × Φ25.4 mm × 180 mm. T-type and fiber-optic take-up reels are also offered for this system. Assess whether reel capacity suits your operating needs and anticipated changeover time.

Review The Production Line’s Key Equipment And Controls

Consistent output depends on aligning tension, resin placement, and UV exposure. Operators can use the system to match settings with the needs of their cable design and fiber ribbon.

Coordinate Fiber Tension, Resin Dispensing, And UV-LED Curing

Electro-pneumatic adjustment is used for each pay-off unit. Through the interface, operators set adhesive-dot spacing and counts while dispensers work individually or in linked groups.

Three pre-curing ovens serve the mold groups ahead of UV-LED post-curing. Verify resin compatibility and operating conditions with the supplier.

The Siemens PLC and touchscreen display lamp current and oven temperature, generate alarms, and support preset lengths. Before purchase, review cabinet requirements and power supply needs.

Process Stage Specification Buyer verification
Tension of fibers Pay-off: 0.4 to 2 N, ±0.02 N; capstan: 50 to 500 g, ±5 g accuracy Align settings with cable requirements
Dispensing of resin Independent or linked units; set adhesive-dot spacing and count Review interface settings
UV-LED curing Three pre-curing ovens rated 800 W each; one post-curing oven rated 6 kW; 395 nm ± 3 nm; at least 85% cure during stable, high-speed operation Verify compatibility with the resin
Monitoring Siemens S7-1200 or S7-1500 PLC; 10.4-inch touchscreen; live lamp current and oven temperature, alarms, preset lengths Verify cabinet and power supply requirements

Prepare Line Configuration, Installation, And Operating Conditions

Before the machine is delivered, prepare a dedicated operating area. An enclosed, clean, dry, draft-free space is required for the optical fibre system. Keep the temperature from 15°C to 25°C, with humidity at or below 85%. Maintaining these conditions helps preserve equipment protection and operating precision.

Review site utilities, electrical capacity, cabinet space, and cable design with your facilities team. Nitrogen at 7 bar with 99.99% purity and compressed air at 6 bar are specified for the system. The electrical supply must be three-phase, five-wire, and 380 V ±10%.

  • Allow space for the cabinet, components, resin, and access to service parts. Before starting the line, confirm the temperature settings and tension control.
  • Plan around the specified reel dimensions of Φ410 mm × Φ50.8 mm × 391 mm. The take-up unit supports reels weighing up to 30 kg.
  • Include the main power feed-in cable in your site plan. The equipment package excludes connection cables and cable trays.

The supply scope, reel types, and installation needs should be checked before placing an order. This assessment can reduce setup time and help prevent later delays. Ask the supplier to verify settings for your fiber and cable design, including lamp accuracy and operating conditions. A clear plan helps the production system begin operating more smoothly.

Obtain Pricing For A Ribbon Production Solution Matched To Your Needs

At its stated speed of 600 m/min, this line can be considered by manufacturers producing rollable 12- or 16-fiber formats. When requesting a quote, share your fiber layout, output goals, cable requirements, reel preference, and factory conditions.

Check the proposed system for its 16-spool pay-off, UV-LED curing setup, take-up capacity, and included options. Examine the included components, dispensing-head options, unit functions, and cable design prior to ordering.

Listed documents include operating and maintenance manuals, a general layout drawing, electrical schematics, and a wear-parts list. These documents can help assess setup time and ongoing service needs.

For pricing and configuration details matched to your production plan and site utilities, consult Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. Verify the supply scope and replacement parts before purchase.

TROUBLESHOOTING EXTRUSION DEFECTS ON THE FIBER RIBBON LINE

A production line for intermittently bonded ribbon is designed to produce flexible fiber groups for contemporary, high-count cable architectures. It keeps fibers properly aligned for expedited mass fusion splicing, yet allows the fiber group to remain flexible within a compact cable core.

Compared with continuously bonded ribbons, intermittent bonded ribbons feature localized bonds at predetermined intervals. This strategic placement keeps the fibers in an organized sequence while the ribbon can bend and roll into circular loose tubes and other confined spaces.

Network engineers employ this method when faced with constraints in duct space, splice closures, and equipment racks. A meticulously crafted ribbon cable facilitates dense network deployments in data centers, telecom backbones, metro networks, FTTx feeder systems, and 5G transport networks.




Main Takeaways

  • An intermittently bonded ribbon line enables flexible, high-density fiber arrangements.
  • Localized bonds keep optical fibers aligned while preserving ribbon flexibility.
  • Flexible ribbons support higher fiber counts within small circular cable constructions.
  • Consistent fiber alignment makes mass fusion splicing quicker and easier.
  • Ribbon cable systems support data centers, telecom backbones, and fiber access networks.

Intermittent Bonded Ribbon Production Line Overview

Intermittent bonded ribbon production enables the creation of fiber designs that combine high density with practical handling. This method involves placing bonds at predetermined intervals, allowing for the movement of fiber subunits between these points.

This production approach supports the incorporation of a higher number of fibers within constrained duct spaces. It also ensures the preservation of the organized ribbon structure, essential for efficient splicing and cable assembly processes.

What Is An Intermittently Bonded Fiber Ribbon?

An intermittently bonded optical fiber ribbon connects adjacent fibers at specific intervals along its length. The segments between these bonds remain unencumbered, enabling the ribbon to adopt various configurations without rigidification.

This ribbon format is commonly described as a rollable, flexible, or spider web ribbon. It contrasts with the conventional flat ribbon cable, which maintains a fixed profile along its entire length.

For splice preparation, the fibers can be arranged into a flat ribbon for mass fusion operations. In cable production, the same fibers create space-efficient bundles, optimizing space utilization within the cable.

Why Flexible Ribbon Technology Matters For High-Density Fiber Networks

Network designers frequently face the challenge of increasing capacity within densely populated conduits, data centers, and access routes. The flexible nature of a flat cable structure enables ribbon groups to be packed into smaller cable cores, preserving fiber order.

The fiber density ratio is a critical metric for network builders, comparing the space occupied by fibers to the total cable area. Intermittent bonding enhances this ratio, allowing ribbon groups to occupy available spaces within the cable.

For network installers, high-density fiber cables reduce the number of cables required for a given route. This design also supports high fiber counts without necessitating a rigid ribbon stack.

Intermittent Bonded Ribbon Production LineIntermittent Bonded Ribbon Production Line

Ribbon Feature Intermittently Bonded Design Conventional Continuous Ribbon
Bonding pattern Separated bonds at controlled intervals Bonding maintained continuously along the ribbon
Fiber form between bonds Can roll, curl, or fold for compact packing Remains predominantly flat and planar
Splicing position Can return to a flat format for mass fusion splicing Remains permanently in a flat ribbon configuration
Cable packing function Supports dense, flexible subunit placement Relies on a relatively rigid ribbon stack
Typical cable application Flexible flat cable and high-density fiber cable designs Conventional fixed ribbon cable structures

Construction And Material Requirements For Intermittent Bonded Ribbon

An intermittently bonded ribbon combines precise fiber placement with adaptable bonding points. Its architecture facilitates dense cable configurations while allowing effortless separation during handling, routing, and splicing.

Material selection significantly influences ribbon width, peel characteristics, and durability. Each optical fiber subunit must keep its fibers properly positioned without imparting undue stiffness to the ribbon.

Fiber Count And Subunit Arrangement

Intermittently bonded ribbons can contain 4, 8, 12, 24, or up to 36 fibers. The choice of fiber count is determined by cable capacity, available duct space, and the requirements of subsequent mass fusion splicing.

A 12-fiber configuration often employs six subunits, with two adjacent fibers in each subunit. The fibers within a subunit may be in contact or separated by no more than one and a half times the fiber diameter.

Small gaps placed between subunits ensures ribbon flexibility. These gaps typically span from 5 to 100 micrometers, while the fibers remain aligned side by side across the ribbon width.

Ribbon Construction Element Typical Configuration Manufacturing Purpose
Ribbon fiber count 4, 8, 12, 24, or as many as 36 fibers Matches cable density and splice capacity
Subunit configuration Two neighboring fibers in each optical fiber subunit Allows controlled separation between fiber groups
Subunit fiber spacing Touching or up to 1.5 fiber diameters Maintains a compact and stable profile
Gap between subunits 5 to 100 micrometers Allows greater movement and flexibility near bond points

UV-Curable Resin And Wet-On-Wet Bonding

The coating and bond systems frequently employ UV-curable resin systems. Wet-on-wet bonding involves applying the bond material to the uncured subunit coating, which then cures together under UV energy.

This technique generates a diffusion zone where the materials interact. For intermittent bonded ribbons, this zone can range from 2 to 50 micrometers, with 5 to 15 micrometers being the typical focused process range.

UV-curable resins can intermingle at the interface before curing. This facilitates molecular entanglement between the bond and the optical fiber subunit coating, resulting in bonds that are both secure and flexible.

Core Equipment In An Intermittent Bonded Ribbon Production Line

A fiber ribbon production line combines advanced motion control with meticulous material handling. Each station ensures fibers remain aligned, clean, and stable from the initial payoff to the final winding.

The line equipment manages adjacent fiber placement, subunit coating, intermittent bonding, UV curing, cooling, inspection, and take-up. This sequential process enables manufacturers to manufacture customized flexible ribbon, preserving the integrity of the fiber order.

Fiber Payoff And Tension Control Equipment

Fiber payoff units supply individual optical fibers at a consistent rate from spools. Guides, rollers, and tension sensors prevent sudden pulls, averting twist, slack, or uneven spacing.

During ribbon production, maintaining balanced fiber paths before alignment is critical. Stable tension is essential for forming flat subunits and ensuring accurate color sequence control.

Discrete Bond Applicator And Coating Die

The coating die applies a UV-curable material around groups of two or more fibers. This material defines subunits while maintaining fibers in a flat, parallel layout.

A bond applicator then applies a second resin between neighboring subunits at planned intervals. This spacing allows the ribbon to flex and separate when needed, a critical aspect of custom ribbon cable design.

Line Equipment Primary Function Process Benefit
Fiber payoff and tension unit Delivers fibers while maintaining regulated tension Minimizes twisting and uneven fiber loading
Subunit coating die Applies coating to form defined fiber subunits Maintains consistent subunit shape and width
Intermittent bond applicator Deposits resin at set intervals Provides controlled flexible bonds between subunits
UV cure and take-up system Cures and cools the ribbon before inspection and winding Maintains bond integrity while preserving fiber sequence

UV Curing, Cooling, And Ribbon Winding Equipment

UV energy cures the subunit coating and intermittent bonds while the resin is wet. This wet-on-wet process forms a cohesive interface between materials, influencing bond strength.

Cooling equipment lowers ribbon temperature before inspection and winding. The fiber ribbon line may also employ vision checks to monitor width, bond position, and surface quality.

Take-up equipment winds the finished ribbon with low, even tension. Proper winding safeguards the cured structure, ensuring the custom ribbon cable is ready for later cabling, splicing, or connector assembly.

Fiber Alignment, Preparation, And Color Sequence Management

The foundation of a stable ribbon cable with fiber preparation. Each strand must enter the assembly clean, centered, and in the correct sequence before the coating and bonding processes commence.

Managing Fiber Identification During Splicing And Maintenance

Consistent fiber color identification is indispensable for splicing, testing, and maintenance operations. The standard 12-fiber sequence, typically consisting of blue, orange, green, brown, slate, white, red, black, yellow, violet, rose, and aqua, facilitates swift identification.

When fiber counts increase, the sequence may be repeated within controlled subunits. This method ensures that each ribbon cable remains organized within splice trays, closures, and cable connector layouts.

Ribbon Fiber Position Fiber Identification Color Process Purpose
1 Blue Starts the standard fiber color sequence
2 Orange Provides rapid visual identification
03 Standard green Helps preserve the established fiber order
04 Standard brown Supports confirmation of subunit position
05 Slate Supports identification around the middle of the sequence
6 White Provides strong visual contrast for inspection
07 Red Improves traceability in splicing records
8 Standard black Supports sequence identification inside splice trays
09 Standard yellow Supports rapid identification during restoration work
Position 10 Violet Helps distinguish later positions in the standard sequence
Position 11 Standard rose Helps maintain clarity in higher-count ribbon layouts
Position 12 Standard aqua Marks the final position in the standard color order

Avoiding Fiber Twist And Tension Imbalance

Fiber guides and payoff units are important in maintaining fibers in a flat, side-by-side configuration. This prevents twist, crossing, and gaps that could alter the ribbon’s width or distort the bond pattern.

Operators meticulously monitor tension across every path before the fibers reach the coating die. Proper alignment is critical for mass fusion splicing and ensures the finished ribbon cable fits its intended cable connector system.

Intermittent Bond Application And UV Curing Process

Intermittent bonding connects fiber subunits without solidifying the ribbon into a rigid form. This method allows dense routing and ensures dependable handling within a flexible flat cable. It also aids in maintaining the planned fiber layout during subsequent cable assembly.

Applying Intermittent Bonds At Predetermined Intervals

Bond applicators place resin at intervals ranging from 10 mm to 1,000 mm. The bond locations may stagger along the ribbon’s length. This arrangement provides support to adjacent subunits while allowing sufficient free length for movement.

A controlled applicator deposits a measured amount of UV-curable resin at each bond point. Bonds often exhibit a diamond-like shape, with wider centers and narrower ends. The tapered ends help minimize localized stress changes when the cable bends or twists.

Creating Flexible And Strong Bond Interfaces

Wet-on-wet bonding involves applying a second material before the first subunit coating cures. The uncured layers can blend before undergoing a shared UV curing step. This approach fosters a gradual interface, unlike a sharp material boundary.

The resulting material gradient affects various properties, including color, Young’s modulus, and surface friction. Bond ends may feature saddle-like surfaces with both convex and concave curves. These features help the bond resist peeling while facilitating separation when required.

Managing Curing Performance

UV lamps must provide consistent energy across the ribbon. Factors such as line speed, lamp output, resin volume, and exposure time impact the bond’s quality. Selecting the right UV-curable resin ensures rapid curing without compromising the fiber coating.

Operators closely monitor bond shape, cure level, and ribbon flexibility during production. The cured cable should transition smoothly from a flat plane to various forms without bond damage. Controlled curing ensures consistent handling throughout winding and downstream processing.

Flexible Flat Cable And Fiber Ribbon Quality Control

Ensuring each flat ribbon cable’s integrity is a meticulous process. It involves checking the cable’s flexibility and its readiness for subsequent splicing operations. During production, operators assess the fiber count, color sequence, and precise positioning of each fiber. They also evaluate the cable’s winding condition, ensuring its optimal state for assembly.

Frequent quality checks are important in identifying any defects in the coating, uneven tension, or misplaced bonds. These issues, if left unaddressed, could compromise the cable’s performance in subsequent stages of production.

Checking Bond Spacing, Ribbon Width, And Thickness

The distance between bonding points is a critical parameter, requiring adherence to a specific design range. This spacing is essential for the cable’s flexibility, ensuring that the fibers remain aligned within their designated subunits during bending.

Inspection procedures are used to confirm that each bond correctly connects adjacent subunits. This attention to detail ensures that the ribbon lays flat, facilitating smooth mass fusion splicing processes.

Quality Control Point Items Checked Production Value
Fiber sequence identification Count, identification color, and fiber position Supports correct splicing and maintenance work
Intermittent bond arrangement Bond position, interval, and connection between subunits Supports organized fibers without sacrificing flexibility
Finished ribbon profile Width, thickness, and flatness Ensures the ribbon works with downstream handling and splicing tools
Ribbon surface condition UV cure state, coating coverage, and defects Protects the ribbon against damage during take-up

Optical And Mechanical Ribbon Testing

Mechanical assessments focus on bond separation, cohesive strength, elongation, and handling behavior. These evaluations are essential to confirm that the manufacturing process controls are consistent across similar designs of flat cables.

Optical testing includes evaluations after bonding and curing. It ensures that the core, cladding, primary coating, secondary coating, and color layer are adequately protected throughout the manufacturing process.

Optical attenuation checks and handling evaluations are integral to routine inspections. The quality of winding is also scrutinized to ensure that the finished flat ribbon cable is in a controlled condition for assembly.

Production Efficiency, Automation, And Precision Winding

Efficient ribbon manufacturing depends on a unified production line. Each stage, from fiber payoff to inspection and take-up, must harmonize seamlessly. This synchronization ensures the preservation of fiber geometry and facilitates consistent output, critical for high-speed data transmission cables.

Line Synchronization And Process Data Monitoring

Control systems integrate payoff speed, fiber tension, resin delivery, bond placement, UV curing, cooling, and take-up. Adjustments are made in real time to maintain ribbon stability when speed variations occur at any station.

Manufacturing data records capture fiber color sequences, bond intervals, cure settings, ribbon dimensions, and winding status. This detailed history allows operators to track the production of each custom ribbon cable.

  • Stable payoff tension helps prevent fiber stretch and looseness.
  • Bond timing ensures consistent intervals between discrete joints.
  • Dimensional checks detect width or thickness deviations promptly.
  • Take-up data helps with production lot tracking and later processing.

Preparing Wound Ribbon For Downstream Cable Manufacturing

A precision cable winder helps ensure the ribbon is wound onto a spool with uniform tension and controlled movement. This method prevents edge crushing, layer crossing, and sudden pulls during subsequent cable processing.

Finished ribbon units can be stacked, rolled, or loaded into central tube and loose tube designs. These configurations enable the creation of high-speed data transmission cables, even in areas where duct additions are impractical.

For custom ribbon cables, the winding pattern must align with subsequent processes. Proper spool buildup is essential for smooth payout during stranding, tube loading, and cable assembly.

Monitored Area Process Control Focus Resulting Benefit
Payoff section Stable tension and correct color sequence Orderly ribbon placement during cable assembly
Bond application Controlled bond intervals and resin quantity Flexible ribbon behavior during handling
UV cure stage Regulated UV intensity and exposure duration Properly cured bonds before ribbon winding
Cable winding system Uniform traverse with controlled spool tension and layering Controlled ribbon feed into loose tube or central tube production

Ribbon Cable Applications, Fusion Splicing, And Connector Planning

Ribbon fiber plays an important role in dense links within data centers, telecom backbones, metro rings, and FTTx feeder routes. It also excels in indoor FTTH runs, 5G fronthaul, and outdoor point-to-point networks where space is at a premium.

A meticulously planned ribbon cable assembly enables crews to manage high fiber counts efficiently, without increasing bulk. Each high-speed data transmission cable must align with the site’s route, enclosure space, and future expansion plans.

Mass Fusion Splicing Advantages

A ribbon fusion splicer allows the joining of an entire ribbon in a single operation. For a 12-fiber ribbon, a matching cleaver can prepare all 12 fibers simultaneously before the automated fusion process commences.

This approach minimizes handling time and ensures consistent fiber alignment. Splice loss is reported to remain below 0.05 to 0.10 dB per fiber, contingent upon controlled preparation, cleaning, and machine settings.

Loose tube cable, by comparison necessitates a different strategy at the splice cassette. Technicians must separate the fibers, then splice them individually, which prolongs the ribbon cable assembly process.

Connection Planning For Dense Links

Multi-fiber connections commonly use MPO or MTP trunks, harnesses, fanout cables, and cassette modules. The chosen cable connector must align with the fiber count, polarity method, connector gender, and fiber type.

Connection planning also includes transceiver requirements and the full link loss budget. A high-speed data transmission cable, when used with parallel optics, demands a clear polarity path from equipment port to patch panel.

Connection Planning Item Primary Control Common Network Use
Number of ribbon fibers Splice capacity and cassette selection Backbone links using 12-fiber or 24-fiber ribbons
MPO or MTP multi-fiber connector Connector polarity, gender, and port compatibility Data center trunks and 5G equipment rooms
Harness or fanout cable Transition from multi-fiber connections to single-fiber ports Network switch connections and patch fields
Network loss budget Permitted optical loss across splices, connectors, and fiber High-speed optical transmission routes

Shanghai Weiye OFC Equipment For Ribbon Line Projects

Shanghai Weiye OFC Equipment, commonly referred to as SHWY, specializes in machinery for the production of optical fibers and cables, serving markets in the United States and globally. Its offerings are designed to support consistent manufacturing, facilitate clear operator control, and enable seamless integration into production lines.

For initiatives requiring an intermittent bonded ribbon production line, SHWY supports every stage of ribbon handling, curing, and winding with suitable machinery.

SHWY Optical Fiber And Cable Machinery Experience

Operating since 1998, SHWY’s journey in the industry has been marked by significant milestones. By 2012, its annual turnover surpassed 200 million CNY, strengthening its position within a prominent Chinese fiber and cable conglomerate as a joint venture.

In 2020, SHWY transitioned to independence, relocating to a state-of-the-art facility in central Shanghai. This move underscored its commitment to advancing equipment research, manufacturing, and process application while supporting operational stability.

SHWY Production Equipment Portfolio

SHWY offers a diverse range of equipment, including fiber draw towers, coloring machines, secondary coating lines, SZ stranding equipment, and cable sheathing lines. Notably, it also features a fiber ribbon line tailored for flat, high-count fiber formats.

For ribbon projects, a cable precision winder plays a critical role in maintaining orderly package buildup and controlled tension. This ensures safer transport and more consistent feeding into subsequent cable production stages.

The broader SHWY portfolio also includes FTTH lines, indoor cable equipment, and OPGW fiber-in-stainless-steel-tube systems. These options enable manufacturers to integrate an intermittent bonded ribbon production line with complementary cable processes.

Final Thoughts

An intermittent bonded ribbon production line integrates fiber alignment, controlled bonding, UV curing, inspection, and precision winding into a unified process. Each step helps preserve fiber sequence while maintaining the necessary bendability for dense cable designs. This combination is critical for the creation of high-density optical networks.

The finished ribbon cable enables efficient mass fusion splicing and organized fiber management. It is particularly useful for networks with high fiber counts, confined ducts, limited tray space, and frequent splice points. This makes it a cornerstone in many high-density ribbon cable routes.

Comprehensive project planning reaches beyond the production line. It encompasses the cable structure, closure capacity, fusion tools, test methodologies, labeling, and restoration records. These elements must align with the planned network architecture for seamless integration.

Related: HOW TO OPTIMIZE EXTRUSION PARAMETERS ON THE FIBER CABLE SHEATHING LINE
         Fiber Protection and Routing within the Compact Fiber Unit